| CONSTRUCTION PROGRESS PHOTOS |
|
| Construction Progress as at 15 Feb 2011 |
|
| |
|
 |
 |
| Guardhouse under construction. |
The meandering stream almost completed. |
| |
|
 |
 |
| Stainless steel staircase for carpark area to lobby. |
Gondola system being used to do cleaning and touch-up works. |
| Construction Progress as at 15 Jan 2011 |
|
| |
|
 |
 |
| The entrance statement rock sculptures. |
Timber decking at Level 7. |
| |
|
 |
 |
| Extensive external works for sewerage and drainage system. |
Plotting the flow of the 75-meter stream. |
| Construction Progress as at 15 Nov 2010 |
|
| |
|
 |
 |
| Marble-cladded columns at the tennis court area. |
Gymnasium area in good progress. |
| |
|
 |
 |
| Rock sculptures welcoming visitors at the Grand Entrance. |
Part of the changing room near swimming pool under construction. |
| Construction Progress as at 15 Oct 2010 |
|
| |
|
 |
 |
| Works on the 3-meter waterfall at the entrance statement. |
Another beautiful marble column at Level 7. |
| |
|
 |
 |
| The pergola near to the tennis court. |
Works commencing at the 75-meter landscaped garden. |
| Construction Progress as at 15 Sept 2010 |
|
| |
|
 |
 |
| The decorative boulder at Level 7. |
The sprial staircase leading to Reading Room at Level 7A. |
| |
|
 |
 |
| Part of the feature wall at Lift Lobby. |
The 7.6 meter water feature wall at Porte Cochere. |
| Construction Progress as at 15 Aug 2010 |
|
| |
|
 |
 |
| The double volume ceiling at Porte Cochere. |
A view from Lift Lobby of Porte Cochere. |
| |
|
 |
 |
| Garden Villa's Fully-Fitted Dry Kitchen Cabinets. |
Master Bathroom of Garden Villa. |
| Construction Progress as at 15 July 2010 |
|
| |
|
 |
 |
| The ambience at Lift Lobby complete with veneer and mirror. |
The 5-seater Jacuzzi at the roof top of Garden Villas. |
| |
|
 |
 |
| Bamboo veneer at Recreational Podium (Level 7). |
Spiral staircase leading to Reading Room at Level 7A. |
| Construction Progress as at 15 June 2010 |
|
| |
|
 |
 |
| The grand Porte Cochere undergoing transformation. |
Veneer-cladded and marble walls adorning the lift lobby area. |
| |
|
 |
 |
| Water feature in lobby area with unique glass structure. |
Stone flooring being laid at Recreational Podium (Level 7). |
| Construction Progress as at 15 May 2010 |
|
| |
|
 |
 |
| Extensive works at Porte Cochere area. |
Marble cladded lift lobby at Porte Cochere. |
| |
|
 |
 |
| Part of the water features adorning the Porte Cochere. |
Honeycomb structures completed at the Recreational Podium (Level 7). |
| Construction Progress as at 15 April 2010 |
|
| |
|
 |
 |
| Garden Villas Block B works in smooth progress. |
A glimpse of our latest offering at Level 21 (Sky Lounge) - Anti-oxidant therapy centre. |
| |
|
 |
 |
| Squash court at Level 7 being constructed. |
Water proofing works on Leisure Pool at Recreational Podium. |
| Construction Progress as at 15 March 2010 |
|
| |
|
 |
 |
| Dry Kitchen Cabinets Installed Up To Level 20. |
Honeycomb Covering A Major Part of Recreational Podium's Ceiling at Level 7. |
| |
|
 |
 |
| A Grand View From Level 18 (Type C Unit). |
Rock Cladded Columns Leading to Tennis Court. |
| Construction Progress as at 15 February 2010 |
|
| |
|
 |
 |
| Type A 3rd bedrooms sliding wardrobe. |
Type B's long bath in master bathroom. |
| |
|
 |
 |
| The timber screen at the entrance of Type A. |
The main entrance door to Type C. |
| Construction Progress as at 15 January 2010 |
|
| |
|
 |
 |
Honeycomb designs enveloping the whole ceiling of Recreational
Podium (Level 7). |
Veneer adorning the walls at Lift Lobby of all floors. |
| |
|
 |
|
| Fully-fitted Type A wet kitchen. |
|
| Construction Progress as at 15 December 2009 |
|
| |
|
 |
 |
| Fully fitted-out Master Bathroom of Type C (Duplex). |
Huge rock cladding for feature wall at Level 7 (Recreational Podium). |
| |
|
 |
|
| The eye-catching timber feature wall for Type A units. |
|
| Construction Progress as at 15 November 2009 |
|
| |
|
 |
 |
| The Majestic 11-meter Height Waterfall. |
The Fully-fitted Out Type A Dry Kitchen. |
| Construction Progress as at 15 October 2009 |
|
| |
|
 |
 |
Part of the Honeycomb Structure Enveloping the Ceiling of Level
7 (Recreational Podium). |
The Completed Wet Kitchen for Type C. |
| Construction Progress as at 15 September 2009 |
|
| |
|
 |
 |
| Rock cladding being prepared to be installed on columns at the Recreational Level (Level 7). |
Emergency Staircases are also tiled, instead of just cement
rendered. |
| |
|
 |
|
| Installed dry kitchen for Type B show unit. |
|
| Construction Progress as at 15 August 2009 |
|
| |
|
 |
|
| Elegant timber handrest on glass railing. |
|
| Construction Progress as at 15 July 2009 |
|
| |
|
 |
 |
| Completion of Type C plaster ceiling works for a condominium unit at Level 8. |
Type A master bathroom for a condominium unit is almost completed at Level 9. |
|